Fixed Issues in 11.7.3.0 Release
Tags: Documentation, Release Notes, Version 11.7.3
This section lists issues fixed after the last major release. For additional information on fixed issues, see the Fixed Version column in the NetWitness Platform XDR Known Issues list on NetWitness Platform XDR Community portal.
Platform Fixes
- Column 1: Tracking Number
- Column 2: Description
- Column 1: SACE-19365
- Column 2: When utilizing the NetWitness Recovery Wrapper Tool (NRWT) in version 11.7.x along with the --include-mongo option, it has been observed that the NRWT is collecting only the mongo backup and not taking a backup of the configuration.
Reporting Engine Fixes
- Column 1: Tracking Number
- Column 2: Description
- Column 1: ASOC-128892
- Column 2: Test chart feature in Reports (Reports > Charts > Add new chart > Test Chart) is unable to load with certain time ranges such as 1hr, 3hr, 6hr, 12hr, and 24hr. This issue occurs because Start and End dates are set as required request parameters.
Admin Fixes
- Column 1: Tracking Number
- Column 2: Description
- Column 1: ASOC-127951
- Column 2: Due to the lengthy queries of jobs, Jobs and Admin tabs (Profile > Jobs) take time to load.
Endpoint Fixes
- Column 1: Tracking Number
- Column 2: Description
- Column 1: ASOC-128986
- Column 2: Endpoints Hosts and Files are not getting risk scores for any blacklist files activity.
- Column 1: ASOC-128957
- Column 2: The File Name column is not exported when you export the file attributes to a CSV file.
- Column 1:
ASOC-128409
- Column 2:
In Endpoint, the Hosts tab is not loading because of the presence of huge bash history for a few agents. As a result, you can see timeouts or delays in mongo.db.
- Column 1: ASOC-127140
- Column 2: Due to the vulnerability in the .exe file, the NetWitness Endpoint agent can be disabled and the connection with the endpoint server can be closed without admin rights.