if you want to schedule the report for a specific date and time range from 02/01/2023 12:00:00 AM to 02/15/2023 12:00:00 AM. The report runs for the data on the specified period.
Tags: from 04:00 to 10:00. The report runs for the data on the specified period.<, p>
Note: <, strong><, span><, span>This field appears only if you select Later
and Monthly in the Run field.Note: While scheduling a report, if you select the Past option or Range(specific)/Range(generic) option or an end time range very close to the current time, you must ensure that the aggregate data in the data source is returned. If there is an aggregation delay in the data source, the end time you choose must account for the delay, otherwise reports lose non-aggregate data for that time range.
Use relative time calculation-
By default, the Use relative time calculation option is enabled, and it uses the relative time duration to schedule a report.
For example, if you schedule a report to run over the past 3 hours for the relative time, the time is exactly 3 hours from when the report is run. If the current time is 6:30 P.M., the events that occurred in the past 60 minutes or between 3:30 P.M. and 6:30 P.M. today.
-
You can deselect the option and schedule a report.
For example, if you schedule a report to run over the past 3 hours, it will take the past 3 hours, excluding the minutes. If the current time is 6:30 P.M., the events occurred between 3 P.M. and 6 P.M. today.
Specify the following parameters to configure the Schedule.
Depending on the type of run schedule, select one of the following:
IMPORTANT: Ensure that the SMTP mail server is configured in order to send reports to users.
(Optional) Click Email Output Action and enter the email address to which the generated report needs to be sent.
You can enter multiple comma-separated valid email IDs. For example, email1@example.com,email2@example.com,email3@example.com.
Click Create.
The success message is displayed on the screen.
Note: The time required for reports to be generated may vary based on the amount of data. Please wait for the requested report to be created.
To view the report, do one of the following:
-
On the success message banner, click the hyperlink click here to navigate to the reports tab and open the generated report.
-
Go to Reports > Manage > Reports > View All Reports.
Note:
• You can download the report in a PDF or CSV file format for future and offline needs.
• When the report is generated, it is attached as a PDF to the email and sent to all users configured during the report creation process.
Attachments:
Daily